66 Cambridge Street

Project

66 Cambridge Street

Laboratory / Tech / Science

Boston , MA | 2030

  • 812K GSF
  • 1 Company
  • 2 Professionals

About

The Fallon Company, Ltd is developing 66 Cambridge Street located in Charleston, MA which consists of two core and shell lab and office buildings with separate but nearly-identical HVAC systems. 

The North building is ten floors with 421,600 SF whereas the South building is twelve floors with 390,400 SF. Both buildings are designed to accommodate a mix of 60% laboratory and 40% office space and are connected to a shared 252,000 SF underground parking garage which consists of two floors. 

Project Owner

Fallon Company

Is the project achieving or targeting net zero energy?

Not Targeting or Achieving

Is the project Net Zero or Net Zero Ready?

Net Zero Ready

Project Size in GSF

812K

Category of height

Mid-Rise

How is the building all-electric for heating?

Air-source Heat Pump

What other systems are used for heating?

Fossil Fuel (Emergency Backup or Lab/Healthcare Only)

Is the service hot water all-electric?

Yes

What is the primary system type for domestic hot water?

Electric resistance storage

On-site renewable energy

0%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

No

Certifications related to Energy / Carbon

LEED

Site EUI

132.0 kBtu/sf/year

Net Site EUI

132.0 kBtu/sf/year

The EUI is

Modeled

Carbon Emissions Intensity (CEI)

6.90kg/CO2e/sf

What is the climate zone for this project?

5A Cool Humid

Project Team

Electrical Engineering
  • BR+A

    In Business Since 1975

    14.9M GSF

    40 Projects

    6 Professionals

Plumbing Engineering
  • BR+A

    In Business Since 1975

    14.9M GSF

    40 Projects

    6 Professionals

Mechanical Engineering
  • BR+A

    In Business Since 1975

    14.9M GSF

    40 Projects

    6 Professionals

Energy Engineering
  • BR+A

    In Business Since 1975

    14.9M GSF

    40 Projects

    6 Professionals

  • Jacob Knowles

    Director of Sustainable Design

    14.5M GSF

    39 Projects

    24 Years Experience

Sustainability Consulting
  • Heather Walters

    LEED AP BD+C, LFA

    Sustainability Consultant

    4.3M GSF

    13 Projects

    26 Years Experience