786 Belmont Public Library

Project

786 Belmont Public Library

Assembly

Belmont , MA | 2026

  • 40K GSF
  • 2 Companies

About

The Library Building Committee worked closely with the Library Project design team, the Belmont Energy Commission, and environmentally focused town groups, to ensure that the new library is working towards Belmont’s energy goals. Exciting sustainability features of the new library include: 

  • A south facing solar photovoltaic (PV) array
  • Rooftop mechanicals with a generator
  • All-electric, net-zero-ready systems
  • A highly insulated building envelope
  • Glazing/glass under 40%
  • Daylighting – window and skylight placement to maximize effective internal lighting
  • A green roof opportunity
  • Stormwater management systems
  • A rain garden filtration system
  • Native vegetation
  • Car charging stations

Project Owner

Town of Belmont

Is the project achieving or targeting net zero energy?

Targeting

Is the project Net Zero or Net Zero Ready?

Net Zero

Project Size in GSF

40K

Category of height

Low-Rise

How is the building all-electric for heating?

Air-source Heat Pump

Is the service hot water all-electric?

Yes

On-site renewable energy

100%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

No

The construction cost difference from "conventional" to being net zero "ready" (including incentives) for this building is

>-1% to 1%

Site EUI

23.0 kBtu/sf/year

Net Site EUI

0.0 kBtu/sf/year

What is the climate zone for this project?

5A Cool Humid

Project Team

Energy Engineering
Architecture