Project
Brockton Behavioral Health Center
Healthcare
Brockton , MA | 2022
- 57K GSF
- 2 Companies
- 4 Professionals
About
This redevelopment of a former 1960’s nursing home created a total of 82 treatment beds in a net-zero facility that prioritizes dignity and safety for both patients and staff. The behavioral health center was purposefully located in a demographically diverse city to take a meaningful step forward in addressing treatment disparities among underserved populations.
The ongoing mental health crisis in Massachusetts is deteriorating the collective welfare of communities, and stems from a lack of licensed treatment beds along with an extraordinary workforce crunch. The Behavioral Health Center addresses both by contributing licensed beds to the healthcare ecosystem while creating a healing environment where staff feel safe and valued.
Project Owner
Boston Medical Center
Is the project achieving or targeting net zero energy?
Targeting
Is the project Net Zero or Net Zero Ready?
Net Zero Ready
Project Size in GSF
57K
Category of height
Low-Rise
How is the building all-electric for heating?
Ground-source Heat Pump
What other systems are used for heating?
Exhaust-source Heat Pump
Is the service hot water all-electric?
Yes
What is the primary system type for domestic hot water?
Ground-source heat pump
On-site renewable energy
100%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
No
The construction cost difference from "conventional" to being net zero "ready" (including incentives) for this building is
We didn't calculate the cost premium
Site EUI
52.5 kBtu/sf/year
Net Site EUI
0.0 kBtu/sf/year
The EUI is
Measured
Carbon Emissions Intensity (CEI)
0.00kg/CO2e/sf
What is the climate zone for this project?
5A Cool Humid