Bunker Hill Housing Redevelopment

Project

Bunker Hill Housing Redevelopment

Residential: Affordable Multi Family

Boston , MA | 2031

  • 3.3M GSF
  • 4 Companies
  • 3 Professionals

About

The proposed project consists of the redevelopment of the existing BHA Bunker Hill public housing development. The project scope includes the phased demolition of existing 1,100 unit BHA site (42 bldgs.) and the construction of 2,699 mixed income residential units, (15 new bldgs.) 1,010 of which are direct, income-restricted BHA replacement units (at least twenty two percent (22%) of all the residential units shall be income-restricted). The Master Proposed Project, as described, 4 assumes that the remaining one hundred (100) BHA public housing units shall be replaced elsewhere in the Charlestown neighborhood. Project includes retail/civic space, 20% of retail space shall be made available to tenants at 50% of triple net market rate. Project also includes parking and new public open space. The Proposed Master Project will include approximately, 3,287,000 square feet of Gross Floor Area. (according to "Bunker Hill Housing DPIR - CNBA 2020-02-18 .pdf, Master Plan Total: 3,083,761, Parking Total: 205,200, Residential Total: 2,878,561).

Project Owner

Boston Housing Authority

Is the project achieving or targeting net zero energy?

Targeting

Is the project Net Zero or Net Zero Ready?

Net Zero Ready

Project Size in GSF

3.3M

Category of height

Mid-Rise

Number of residential units

2,699

How is the building all-electric for heating?

Air-source Heat Pump

Is the service hot water all-electric?

Yes

On-site renewable energy

7%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

Unknown

Certifications related to Energy / Carbon

LEED, PHIUS

Site EUI

19.2 kBtu/sf/year

Net Site EUI

17.9 kBtu/sf/year

What is the climate zone for this project?

5A Cool Humid

Project Team

Plumbing Engineering
Mechanical Engineering
Subcontractor
Energy Engineering
Architecture
Sustainability Consulting
  • Daniel Perez

    CPHC®

    CPHC

    3.5M GSF

    3 Projects

    3 Years Experience