FBMS 128 Manley St (Phase 1)

Project

FBMS 128 Manley St (Phase 1)

Residential: Multi-family

Brockton , MA | 2024

  • 14.3K GSF
  • 1 Company

About

This project is the adaptive re-use of the vacated, 3-acre, former Army Reserve Center at 124 Manley Street into a Housing Resource Center for Father Bill’s & MainSpring with 30 units of supportive housing. The existing site has two structures; the larger, 14,304 square foot, 1-1/2 story, uninsulated, masonry and steel structure main building and a modest brick garage out building which is not scheduled for renovations.

Phase 1 is the renovation of the existing main building into the Housing Resource Center. The structure will get a “deep energy retrofit” with a new exterior insulation and cladding, windows, roof, and HVAC systems. It will provide 128 emergency shelter beds and additional emergency overnight accommodations as needed, a full commercial style kitchen with a large dining/common area, new bathrooms, a health clinic, and offices for staff, case managers and counseling. The site and building will be made fully accessible per MAAB guidelines and a ramped walkway will be included to allow access to and from Manley Street. The site is to be improved with new lawn & trees, shrubbery, and perennials, ‘dark sky’ site lighting, existing fencing changes, and a new parking lot with bike storage and an on-site storm water collection and infiltration system. Phase 1 will have 26 parking spaces.

Is the project achieving or targeting net zero energy?

Targeting

Is the project Net Zero or Net Zero Ready?

Net Zero

Project Size in GSF

14.3K

Category of height

Low-Rise

Number of residential units

30

How is the building all-electric for heating?

Air-source Heat Pump

Is the service hot water all-electric?

No

What is the primary system type for domestic hot water?

Fossil-fuel fired

On-site renewable energy

0%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

No

Site EUI

16.2 kBtu/sf/year

Net Site EUI

16.2 kBtu/sf/year

The EUI is

Modeled

What is the climate zone for this project?

6B Cold Dry

Project Team

Sustainability Consulting
  • West Work

    In Business Since 2020

    306.3K GSF

    9 Projects

    2 Professionals

Architecture
  • West Work

    In Business Since 2020

    306.3K GSF

    9 Projects

    2 Professionals