Linnean Apartments

Project

Linnean Apartments

Residential: Affordable Multi Family

Cambridge , MA | 2023

  • 15K GSF
  • 2 Companies

About

OVERVIEW.  Linnaean Apartments contains 20 units of elderly/disabled efficiency dwelling units in a low-rise building managed and maintained by the Cambridge Housing Authority.

THE EXISTING BUILDING.  This three story wood frame, masonry and cast concrete building includes exterior corridors/balconies, and was originally constructed in 1962, then later purchased but never used as a college dormitory for Radcliffe. In 1981 the structure was converted into affordable elderly and disabled housing. Per a recent capital needs assessment, it was clear that a number of building attributes were approaching the end of their useful lifespan.

DEEP ENERGY RETROFIT GOAL.  The project goal is a full envelope and systems update to achieve a deep energy retrofit providing:
 - improved occupant comfort
 - exceptionally low operating costs
 - healthier indoor air quality
 - long term durability with low maintenance
 - zero on-site fossil fuel use

ENVELOPE & SYSTEMS IMPROVEMENTS. The goal is for the building to be revitalized with a new super-insulated enclosure, high performance windows, high efficiency heating/cooling, new domestic hot water systems, new mechanical ventilation, and if budget allows, a solar electric system to help offset consumption.

Project Owner

Cambridge Housing Authority

Is the project achieving or targeting net zero energy?

Targeting

Is the project Net Zero or Net Zero Ready?

Net Zero Ready

Project Size in GSF

15K

Category of height

Low-Rise

Number of residential units

20

How is the building all-electric for heating?

Air-source Heat Pump

Is the service hot water all-electric?

Not Applicable

On-site renewable energy

0%

Is the owner purchasing off-site renewable energy to offset all electricity consumption?

Unknown

The construction cost difference from "conventional" to being net zero "ready" (including incentives) for this building is

<-11%

Site EUI

0.0 kBtu/sf/year

Net Site EUI

0.0 kBtu/sf/year

What is the climate zone for this project?

5A Cool Humid

Project Team

Plumbing Engineering
Mechanical Engineering
Electrical Engineering
Architecture