Project
Maria Hastings Elementary School
Education K-12
Lexington , MA | 2020
- 110K GSF
- 4 Companies
- 1 Professional
About
The project was a replacement of an elementary school in Lexington, MA. The existing building was demolished after the new building was constructed. The new 110,000 SF school serves 645 students, 111 full-time employees and 7 part-time employees. The all-electric building features Ground Source Heat Pumps, a rooftop PV array and parking lot canopy system, and onsite battery storage. The building's operational EUI is 23.4. For 2022 and 2023 the building's average consumption was 18% less than projected, therefore the building is operating net energy positive by 37%.
Project Owner
Town of Lexington
Is the project achieving or targeting net zero energy?
Achieving
Is the project Net Zero or Net Zero Ready?
Net Zero
Project Size in GSF
110K
Category of height
Low-Rise
How is the building all-electric for heating?
Ground-source Heat Pump
Is the service hot water all-electric?
No
On-site renewable energy
100%
Is the owner purchasing off-site renewable energy to offset all electricity consumption?
No
The construction cost difference from "conventional" to being net zero "ready" (including incentives) for this building is
>-1% to 1%
Net Site EUI
23.4 kBtu/sf/year
The EUI is
Modeled
What is the climate zone for this project?
5A Cool Humid